







Prefabricated interior and exterior walls
Classification:
Engineering
Key words:
Engineering
Prefabricated interior and exterior walls
Design the service process
Participate in on-site consultation, make feasibility study reports according to the characteristics of the project and the needs of the owner, to ensure that our design meets your operational objectives, make planning and design, effect design in accordance with the local specifications, regulations and needs of the owner, meet your market goals, make construction drawings in line with the local regulations of the project, (architecture, structure, water and electricity, decoration, etc.), in accordance with the local regulations and construction drawings of the project, and accept the construction nodes during the construction process of the project.
What are the advantages of our design services
1. Public buildings, civil buildings, industrial buildings, etc., are not affected by height, region, environment, etc., and all types of buildings can apply our technology and products.
2. It can apply the norms and standards of different countries and regions, and use different styles to meet customer needs.
3. We are a service provider integrating design, production materials and construction, and we have the actual service ability.
4. The building system we design can build a house that satisfies customers in an environment without water, electricity, heat and other energy sources.
5. We design a building system that meets the standards of the Passive House.
6. Our design technology ensures that it is green, energy-saving, and can meet the standards of health buildings.
7. The cost advantage of the house we design is obvious, and the cost can be reduced by 3-5% compared with similar buildings.
Appearance of the factory
Dezhou Dingyao Environmental Protection Building Materials Co., Ltd. was established in 2009 with a registered capital of 20 million yuan. The company's predecessor has been engaged in prefabricated green building design, construction, and material production since 2002. It is engaged in architectural design, construction, material production, and building energy-saving technology research. An enterprise integrating development, development, production and sales, the company has strong technical force, with 5 senior engineers, 15 engineers, and more than 200 employees.

VIDEO



online message